[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 2.

Thesis

Afifi, Muhammad Haizul and Isnain, Amillul Fata Fajrul (2026) ANALISIS WAKTU PELAKSANAAN PEKERJAAN MENGGUNAKAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) DAN BUILDING INFORMATION MODELLING (BIM) (Studi Kasus Proyek Rumah Susun Kawasan Industri Terpadu Batang (KITB)). Undergraduate thesis, Universitas Islam Sultan Agung Semarang.

Isnain, Amillul Fata Fajrul and Afifi, Muhammad Haizul (2026) ANALISIS WAKTU PELAKSANAAN PEKERJAAN MENGGUNAKAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) DAN BUILDING INFORMATION MODELLING (BIM) (Studi Kasus Proyek Rumah Susun Kawasan Industri Terpadu Batang (KITB)). Undergraduate thesis, Universitas Islam Sultan Agung Semarang.

This list was generated on Wed Jun 10 03:31:07 2026 UTC.