Afifi, Muhammad Haizul and Isnain, Amillul Fata Fajrul (2026) ANALISIS WAKTU PELAKSANAAN PEKERJAAN MENGGUNAKAN METODE CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) DAN BUILDING INFORMATION MODELLING (BIM) (Studi Kasus Proyek Rumah Susun Kawasan Industri Terpadu Batang (KITB)). Undergraduate thesis, Universitas Islam Sultan Agung Semarang.
Teknik Sipil_30202200167_fullpdf.pdf
Restricted to Repository staff only
File Pdf (6MB)
Teknik Sipil_30202200167_pernyataan_publikasi.pdf
Restricted to Repository staff only
File Pdf (70kB)
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Teknik Fakultas Teknik > Mahasiswa FT - Skripsi Teknik Sipil |
| Date Deposited: | 02 Jun 2026 02:44 |
| URI: | https://repository.unissula.ac.id/id/eprint/46833 |
