Tanur, Almas (2026) ANALISA MANAJEMEN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN PABRIK GOLDEN INOVASI DI KAWASAN INDUSTRI KENDAL. Undergraduate thesis, Universitas Islam Sultan Agung Semarang.

Text
Teknik Sipil_30202200038_fullpdf.pdf
Restricted to Repository staff only

File Pdf (4MB)
Text
Teknik Sipil_30202200038_pernyataan_publikasi.pdf
Restricted to Repository staff only

File Pdf (47kB)
Item Type: Thesis (Undergraduate)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik
Fakultas Teknik > Mahasiswa FT - Skripsi Teknik Sipil
Date Deposited: 26 May 2026 04:25
URI: https://repository.unissula.ac.id/id/eprint/46877

Actions (login required)

View Item
View Item