MARTOMO, MARTOMO (2024) EVALUASI PENERAPAN MANAJEMEN MUTU, BIAYA DAN WAKTU PADA PROSES PEMBANGUNAN PROYEK SWAKELOLA (Studi pada Proyek Pembangunan Rumah Sakit Universitas Muhammadiyah Semarang). Masters thesis, Universitas Islam Sultan Agung Semarang.
Text
Magister Teknik Sipil_20202200021_fullpdf.pdf Download (11MB) |
|
Text
Magister Teknik Sipil_20202200021_pernyataan_publikasi.pdf Restricted to Registered users only Download (153kB) |
Item Type: | Thesis (Masters) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Pascasarjana Pascasarjana > Magister Teknik Sipil |
Depositing User: | Pustakawan 5 UNISSULA |
Date Deposited: | 22 Nov 2024 07:01 |
URI: | http://repository.unissula.ac.id/id/eprint/36408 |
Actions (login required)
View Item |