SAPUTRO, AGUNG and ROSALITA, AVIRA (2022) HUBUNGAN PRODUKTIVITAS PEKERJAAN KONSTRUKSI DENGAN PROTOKOL KESEHATAN DALAM MASA COVID. Undergraduate thesis, Universitas Islam Sultan Agung.
This is the latest version of this item.
Text
30201504062_fullpdf.pdf Download (2MB) |
|
Text
publikasi.pdf Restricted to Registered users only Download (227kB) |
Abstract
The relationship between the productivity of construction work and health protocols in the Covid masses, is a study that aims to determine the significant influence caused by the spread of Covid 19 on the construction industry. Looking at the implementation of health protocols and also the implementation of the PSBB, most of which are considered detrimental to several related parties. This study collects data from the MRMP (Modern Rice Millingplant) project. located in Pucangrejo Village, Gemuh District, Kendal Regency. In this study, researchers used quantitative methods, with data collection techniques in the form of questionnaires. The data is then processed with the SPSS 24 for Windows application by conducting a validity test to measure the validity or not of the questionnaire given, and a chi square test to find out whether or not there is a relationship or influence between the two variables. The results showed that, in the validity test, there were 7 invalid questions and 14 questions were considered valid. And in the chi square test, you get a test value of 0.01 which means that the value is smaller than the tolerance value of 0.5, if the test value is smaller than the tolerance value of 0.5, then the test results in the trima or there is a relationship between the two variables, so it can be concluded that there is a significant relationship between the productivity of construction work and health protocols as mass as Covid. Keywords: covid, health protocols, work effectiveness.
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik Fakultas Teknik > Teknik Sipil |
Depositing User: | Pustakawan 1 UNISSULA |
Date Deposited: | 30 Dec 2022 02:55 |
Last Modified: | 30 Dec 2022 02:55 |
URI: | http://repository.unissula.ac.id/id/eprint/25529 |
Available Versions of this Item
-
HUBUNGAN PRODUKTIVITAS PEKERJAAN KONSTRUKSI DENGAN PROTOKOL KESEHATAN DALAM MASA COVID. (deposited 29 Dec 2022 02:30)
- HUBUNGAN PRODUKTIVITAS PEKERJAAN KONSTRUKSI DENGAN PROTOKOL KESEHATAN DALAM MASA COVID. (deposited 30 Dec 2022 02:55) [Currently Displayed]
Actions (login required)
View Item |