RIDWAN, MUHAMMAD AFIF (2017) ANALISIS VALUE ENGINEERING PEKERJAAN SALURAN AIR KOTOR (Studi Kasus pada Proyek Cluster Naraya Bukit Semarang Baru). Masters thesis, Fakultas Teknik UNISSULA.
|
Text
COVER.pdf Download (1MB) | Preview |
|
|
Text
ABSTRAK.pdf Download (94kB) | Preview |
|
|
Text
DAFTAR ISI.pdf Download (97kB) | Preview |
|
|
Text
DAFTAR PUSTAKA.pdf Download (188kB) | Preview |
|
|
Text
BAB I.pdf Download (99kB) | Preview |
|
Text
BAB II.pdf Restricted to Registered users only Download (555kB) |
||
Text
BAB III.pdf Restricted to Registered users only Download (256kB) |
||
Text
BAB IV.pdf Restricted to Registered users only Download (667kB) |
||
Text
BAB V.pdf Restricted to Registered users only Download (199kB) |
||
|
Text
PUBLIKASI.pdf Download (391kB) | Preview |
Abstract
Value engineering is a decision-making process based systematic and structured multi disclipinary. Analyzing the function to achieve the best value of a project by defining the functions necessary to achieve the desired target value. Drainage or sewer is a disposal water mass media in natural or artificial from the surface or subsurface of a place. In the housing scope, drainage is enabled to accomodate the flow of used water and rain water from the house which then flowed into the downstream or river as the final disposal place. The purpose of this study is to assess the initial design of the stream viewed from the cost budget plan. Find out whether the alternative design are required, find out the ideal alternative design, and get a comparison between the initial design and the alternative design. The methodology of data collection is by observation, retrieval of data from PT. Karyadeka Alam Lestari, planning consultant, the public works department of Semarang city, and conduct studies to the library. The result of this research is the analysis of budget plan, the production cost of initial design with u-ditch and buis concrete material is inefficient with budget of cost Rp. 1.781.350.200,- and then made alternative design of u-dit precast with budget Rp. 1.604.402.700,- as the first alternative, buis concrete precast with budget of cost Rp. 1.104.667.700,- as the second alternative, and river stone with budget of cost Rp. 1.437.127.950,- as the last alternative. After comparison between initial design and some alternative design, it is known that alternative design that can be recomended to be done on the Cluster Naraya Bukit Semarang Baru is the second alternative design with buis concrete precast material because it has lower price than the initial alternative, by the difference of profit Rp. 676.672.500,-. In addition, the second alternative also has a good level of durability and time work that fast. The second alternative has a disposal capacity equal to the initial plan. Although it has a smaller disposal capacity compared to the other alternative designs, but the speed can still be fullfilled because it has a channel surface without side. Keywords : Value Engineering, Drainage
Item Type: | Thesis (Masters) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik Pascasarjana > Magister Teknik Sipil |
Depositing User: | Pustakawan Reviewer UNISSULA |
Date Deposited: | 13 Feb 2018 03:49 |
Last Modified: | 13 Feb 2018 03:49 |
URI: | http://repository.unissula.ac.id/id/eprint/10248 |
Actions (login required)
View Item |