STUDI KELAYAKAN EKONOMI PEMBANGUNAN EMBUNG DALAM RANGKA MEMENUHI KEBUTUHAN AIR BAKU BAGI MASYARAKAT (Studi kasus : Proyek Embung Desa Bapangan Kabupaten Jepara)

HIDAYAWAN, AHMAD (2017) STUDI KELAYAKAN EKONOMI PEMBANGUNAN EMBUNG DALAM RANGKA MEMENUHI KEBUTUHAN AIR BAKU BAGI MASYARAKAT (Studi kasus : Proyek Embung Desa Bapangan Kabupaten Jepara). Masters thesis, Fakultas Teknik UNISSULA.

[img]
Preview
Text
COVER.pdf

Download (974kB) | Preview
[img]
Preview
Text
ABSTRAK.pdf

Download (545kB) | Preview
[img]
Preview
Text
DAFTAR ISI.pdf

Download (577kB) | Preview
[img]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (86kB) | Preview
[img]
Preview
Text
PUBLIKASI.pdf

Download (490kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (199kB) | Preview
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (632kB)
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (211kB)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (2MB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (115kB)

Abstract

Kalimati is small dam was a water building which utilize the stream water remains. Small dam is located in Bapangan village, Jepara district. Small dam establishment is functionate to supply people needs of water sources. Small dam kalimati has 280 m of length with depth excavation upstream between 4,80 m and downstream about 2,60 m with wide of pool storage 22.950 m2. Kalimati small dam could save 115.890 m3 of water volume. The capacity of water storage is 107.000m3. this study is purpose to calculate the costs of small dam establishment, to find out the benefits and analixing the economic feasibility. Economic feasibility is calculated by comparing the benefits and the costs of benefits and costs rasio (B/C). The result of this study found that the costs of establishment is Rp 21.964.132.000,00. The calculate of the costs based on the price tag of water is B/C>1, it can be obtained the costs water Rp2.280/m3 for B/C 1,07, IRR 11%, the sensitivity is increase up to 10% and the benefits decrease up to 10% which is can be said that it was impact to the value of the costs and benefits. The Payback Period is still the same with the 8th year. So, it can be concluded that the project of Kalimati’s small dam establishment project was appropriate for economics. Keywords: Costs of establishment, Price tag of water, B/C, IRR

Item Type: Thesis (Masters)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik
Pascasarjana > Magister Teknik Sipil
Depositing User: Pustakawan Reviewer UNISSULA
Date Deposited: 13 Feb 2018 03:48
Last Modified: 13 Feb 2018 03:48
URI: http://repository.unissula.ac.id/id/eprint/10241

Actions (login required)

View Item View Item